Case Studies

Expanded Capabilities Realised For Advanced Pumps

  Mobile Headworks and Switchboard Skid. APT was contracted to design & construct a large headworks skid to be installed at Rio Tinto’s Hope Downs mine site.  The package was supplied as part of a larger pipeline project undertaken and installed by PIHA Pty Ltd. The package is designed as a semi-portable skid to be used for the HD1 dewatering borefield. Some key points about the system included: DN200 (8”) ANSI 300 high pressure pipework, valves and...

Read More

MineSpec Hydro-Boost Pump Set For Rio Tinto

An Engineering Consultanting firm specified the premium MineSpec HydroBoost™ pumpset equipped with Lowara SV vertical multistage pumps for a Rio Tinto minesite in the WA Pilbara region. APT was appointed to design & construct the complete HydroBoost™ pumpset skid for a major contracting company to install at Rio Tinto’s Western Turner Syncline mine site.  The package was supplied as part of a larger pipeline project undertaken and installed by PIHA Pty Ltd. The function of the...

Read More

Sino Iron Emergency Shower and Eye Wash Stations

Advanced Pump Technologies was contracted in 2011 to construct of containerised pump stations and control systems to supply water to the emergency shower and eye wash stations at Sino Iron’s Cape Preston projects. The pump stations are located at the Port, Concentrator, and Crusher facilities on the site. The project consisted of seven (7) 20ft shipping containers each fitted out with the required pumps, controls, and manifolds to ensure simple installation and commissioning on-site. Each...

Read More